Jobsite · Field rules
Do’s and don’ts
Job drawings on site. Temporary bracing before the first column. Correct bolts. No torch-drilled holes. No omitted flange braces.
temporary bracing
flange brace
a307
a325
torch
purlin lap
Job information
- Field-use drawings MUST be the only drawings on the jobsite.
- Erection guides ship to the builder’s office and with each building. Keep at least one copy on site.
Temporary bracing
The erector designs and furnishes all temporary bracing — size, type, location, and quantity.
- NEVER begin erecting without temporary bracing on site and a plan for installing it.
- As erection progresses, install brace rods, flange braces, struts, and purlin/girt laps before panel.
- Do not remove temporary bracing until AFTER wall and roof coverings are installed.
- Do not leapfrog braces. Do not erect more than two bays ahead of the temporary braces. Keep purlins and girts in tension as the frame goes up.
Connection bolts
- Use the bolt length and type called on the erection drawings. Install the quantity called on the frame cross-sections.
- High-strength bolts pretensioned or snug-tight as the drawings require — see Field bolting.
- Never use an A307 bolt and nut where A325 is called for.
Purlin and girt installation
- All purlin/girt lap bolts go in the outermost set of holes.
- If a lap is tight, reversing it often lets the members nest. Time spent nesting a rusty lap pays off when you sheet.
- Always block wall girts to keep them straight.
- Never load purlins at mid-bay. Keep all loading directly over the frames. Do not overload roof secondary.
- When loading roofing bundles onto roof purlins, block the purlins so they cannot crush or roll.
Cutting and burning
- Never use a torch to field-drill a structural connection hole. Drill, or burn a small pilot and ream to a smooth hole of the proper size.
- If you torch-cut a member, grind the edges smooth and touch up with primer or zinc-rich paint.
- Never modify, cut, cope, or add holes in members unless an engineer authorizes it or the erection drawings show it.
Flange braces and brace rods
- Install every flange brace on the drawings. NEVER remove, relocate, or omit one. If holes were missed in manufacturing, the erector puts them in.
- If a flange brace lands in a window, overhead door, or other accessory, call the project manager for written direction.
- Flange braces are required even when you have liner panels.
- Never substitute self-drilling fasteners for bolts unless engineering approves.
- Tighten brace rods snug. Matching rods in a bay get equal tension. NEVER omit or relocate a brace rod.